Home
Blog
Obfuscation
Reversing
Reflector
Archive
Contact
Subscribe
Jason Haley
Ramblings of a .Net developer
.ver 3:0:0:0
FYI: Rotor 2 build takes around 90 min
by
Jason Haley
27. March 2006 07:57
This is just an FYI post. On my laptop (3.4 g with 1 g Ram) Rotor 2 took around 90 minutes to build.
Comments (2)
|
Post RSS
|
Categories:
Tags:
Related posts
Reminder of .Net events coming up around Boston
This Thursday in Waltham is the Boston .Net user group meeting, see the web site for more informatio...
Building Rotor
Building rotor on my newer laptop a P4 3.4Ghz with 1G RAM ... started at 8:41pm, lets see how long i...
Rotor Reminder
The is entry is a personal reminder ... The .cpp class that has all the bcl interal methods mapped ...
Comments
Jim Holmes
(
website link
)
March 27. 2006 11:18
What model laptop do you have that's got a 3.4G proc in it???
(Oh, yeah. That build time sucks.)
Jason Haley
(
website link
)
March 27. 2006 11:45
Here's a link to the laptop specs
jasonhaley.com/blog/archive/2004/09/06/24549.aspx
" rel="nofollow">jasonhaley.com/blog/archive/2004/09/06/24549.aspx">
jasonhaley.com/blog/archive/2004/09/06/24549.aspx
" rel="nofollow">jasonhaley.com/blog/archive/2004/09/06/24549.aspx ... its a full intel processor ... so battery life sucks big time, but as long as i'm plugged it it is as good a most desktops ;)
Comments are closed
TextBox
Search
Include comments in search
Tag cloud
Category list
Azure (7)
BlogContent (1)
Community (11)
Independent Consultant (9)
Innovation (1)
Interesting Finds (813)
Obfuscation (1)
Open Source (1)
Reflector (4)
Silverlight (1)
Utility (1)
Log in